
Overview
Morska Stocznia Remontowa Gryfia is a shipyard that provides repair, reconstruction, and new construction services for various types of vessels, including commercial ships, passenger ferries, multi-purpose units, and military ships. The company also offers steel construction services and has its own laboratory recognized by the Polish Register of Ships. Additionally, they install scrubbers for exhaust gas cleaning and ballast water treatment systems from global brands like Warstillia and ALFA Laval.
Financials
Revenue history (in m)
Filing timeliness
Financial statements were filed on time, on average 48 days early. All were audited by a statutory auditor.
- 202530/04/2026
- 202415/07/2025
- 202328/05/2024
- 202222/05/2023
- 202106/07/2022
- 202006/07/2021
Data and insights are generated automatically from financial statements – they may contain errors and are neither a credit assessment nor business advice.
Sanctions and PEP lists
| Person | List | Match | |
|---|---|---|---|
| Aleksandra Barbara Skibniewska | Członek organu spółki Skarbu Państwa | confirmed | |
| Paweł Maciej Porzycki | Członek organu spółki Skarbu Państwa | confirmed | |
| Rafał Sylwester Wiechecki | Poseł na Sejm Rzeczypospolitej Polskiej | confirmed | |
| Krzysztof Piotr Zaremba | Poseł na Sejm Rzeczypospolitej Polskiej | confirmed | |
| Krzysztof Piotr Zaremba | Poseł na Sejm RP | confirmed |
Statistics
How the company ranks by revenue within its industry, city, voivodeship and across Poland in 2025.
Results vs industry
Industry
Public procurement
6 tenders recorded as contractor: 2 national ($269,992) and 4 EU ($1,518,066).
| Publication date | Subject | Amount | Contracting authority | |
|---|---|---|---|---|
| Aug 11, 2026 | Repair of the propeller blades on the ship Dar Młodzieży | –– | Uniwersytet Morski w Gdyni | |
| Jul 15, 2026 | Repair and maintenance of the underwater section of the hull – painting work on the vessel planeta i | $167.1K$167,062 | Dyrektor Urzędu Morskiego w Szczecinie | |
| Mar 13, 2026 | Dry-docking of the r/v Imor for class survey | $500.6K$500,585 | Uniwersytet Morski w Gdyni |
The company is the contractor in 8 public sector contracts, worth USD 163.98k in total. They were signed with 2 public buyers.
| Signed on | Subject | Amount | Public buyer | |
|---|---|---|---|---|
| Aug 24, 2026 | Cleaning certified light fuel distribution tanks nos. 25, 26 and light fuel sludge tanks nos. 17, 18, and disposal of fuel residues and cleaning materials on the Dar Młodzieży | $6,267 | Uniwersytet Morski w Gdyni | |
| Aug 24, 2026 | Water leak test of the porthole in the mess room. Removal and installation of the porthole in the mess room. If damaged, replacement with a new one. Protection of the student mess room with aluminized glass fabric on the Dar Młodzieży vessel | $3,849 | Uniwersytet Morski w Gdyni | |
| Aug 24, 2026 | Heater – disconnection at the junction box, removal, removal of 2 flanges (2 × 4 bolts), disconnection of the temperature sensor, inspection of the heater on the vessel (work recorded on a separate sheet), cutting new gaskets, reassembly, installation and connection. Additional work: manual transport on board (crane cannot be used – masts), transport to the workshop, removal of sheet-metal cladding, removal of 2 m² of insulation. Removal of all heater connections and bridges – to be checked. Removal of 30 heating elements to replace seals – replacement of 18 heating elements with new ones supplied by the crew – installation of 12 old heating elements. Installation of bridges and connections. Tightening all loose connections. Installation of insulation and sheet-metal cladding. Measure the insulation condition and present the results to the shipowner. Transport to the vessel, manual transport to the installation location. | $2,971 | Uniwersytet Morski w Gdyni |
Morska Stocznia Remontowa Gryfia has been a party to 1 case before the National Appeal Chamber (since 2017).
| Date | Subject of dispute | Outcome | Other party | |
|---|---|---|---|---|
| Jan 16, 2017 | Error in price calculation | Dismissed | Inspektorat Uzbrojenia z siedzibą w Warszawie |
Job offers
The company currently has 6 active job offers at public employment offices. 9 offers were posted in the last 12 months.
| Position | Gross salary | Added | |
|---|---|---|---|
| Ship hull fitter | from 36 PLN/hour | 17 Nov 2026 | |
| Ship Pipe Fitter | from 36 PLN/hour | 17 Nov 2026 | |
| IT Specialist | 6,000–9,500 PLN/month | 12 Nov 2026 |
Authorized Representatives
Manner of representation
Joint action by two members of the management board or by one member of the management board jointly with a commercial proxy is required to make declarations on behalf of the company. If the management board is a one-person management board, one member of the management board is authorised to make declarations on behalf of the company.
Supervisory board
Beneficial owners
| Person | Rights |
|---|---|
Bank accounts
Registered as a VAT taxpayer on 2003-11-30.
44 1240 3927 1111 0010 6868 5633
89 1750 1077 0000 0000 3126 9873
16 1240 3927 1111 0010 7502 3729
Debt
No entries in the National Debtors Register (KRZ).
Real estate
| Type | Amount |
|---|---|
Land (incl. perpetual usufruct) | $95,623$95,623 |
Buildings and premises | $45.5M$45,471,305 |
MSiG notices
67 notices recorded in the Court and Commercial Gazette (MSiG).
| Publication date | Event | |
|---|---|---|
| Oct 8, 2026 | Shareholders' meeting convened | |
| May 6, 2026 | Shareholders' meeting convened | |
| Mar 26, 2026 | Shareholders' meeting convened | |
| Jan 2, 2026 | Shareholders' meeting convened | |
| Sep 15, 2025 | Shareholders' meeting convened |
Public aid
| Grant date | Purpose | Gross amount | Granting body | |
|---|---|---|---|---|
| Mar 18, 2026 | De minimis aid (in accordance with Commission Regulation 2023/2831) | –– | Prezydent Miasta Szczecin | |
| Sep 23, 2025 | De minimis aid (in accordance with Commission Regulation 2023/2831) | –– | Prezydent Miasta Szczecin | |
| Jun 13, 2023 | Liquidity support for undertakings affected by the war in Ukraine | –– | Prezes Banku Gospodarstwa Krajowego |
Regulatory authorisations
| Authority | Type | Status | |
|---|---|---|---|
| Waste generation | Inactive |
Competitors
| Name | Revenue | Website | ||
|---|---|---|---|---|
| Stocznia Szczecińska Wulkan sp. z o.o. | $54,145,208.66 | stoczniawulkan.pl | ||
| Partner Stocznia sp. z o.o. | $26,329,107.57 | partnerstocznia.pl | ||
| Stocznia Wisła sp. z o.o. | $24,681,302.56 | stoczniawisla.pl | ||
| Damen Shipyards Gdynia S.A. | $19,582,753.60 | damen.com | ||
| Remontowa Holding S.A. | $17,031,887.95 | remontowaholding.pl | ||
| Remontowa River Shipyard sp. z o.o. | $15,007,412.88 | remontowa.com.pl | ||
| Naviretech sp. z o.o. | $12,678,933.59 | naviretech.com | ||
| Navikon Sry sp. z o.o. | $11,041,914.19 | navikon.pl | ||
| Stal - Rem S.A. | $10,527,358.43 | stalrem.com.pl | ||
| Timoro sp. z o.o. | $6,241,254.10 | timoro.pl |
Change history
| Date | Event | |
|---|---|---|
| 2026-11-06 | PKD change (Removed: 25.62.Z, 38.31.Z, 71.12.Z; Added: 25.53.Z, 38.21.Z, 71.12.B) | |
| 2020-01-10 | Address change (Ludowa 13, 71-700, Szczecin → Ul. Brdowska 12, 71-700, Szczecin) | |
| 2018-10-17 | Share capital increase (58,564,940.00 PLN → 83,419,540.00 PLN) | |
| 2017-11-28 | Share capital increase (51,000,000.00 PLN → 58,564,940.00 PLN) | |
| 2013-09-30 | Share capital increase (31,000,000.00 PLN → 51,000,000.00 PLN) |
FAQ
Last updated: 2026-11-10