Przedsiębiorstwo Produkcyjno - Usługowe Affabresp. z o.o.
Construction of roads and motorways
Overview
Financials
Revenue history (in k)
From the notes
| Profit allocation | Loss to be covered | |
| Revenue structure | Sprzedaż robót inwestycyjnych | |
| Future lease and rent payments | $63,014 | |
| Management board pay | $80,248 |
Filing timeliness
Financial statements were filed on time, on average 34 days early.
- 202525/06/2026
- 202425/06/2025
- 202326/06/2024
- 202228/06/2023
- 202127/06/2022
- 202029/06/2021
Data and insights are generated automatically from financial statements – they may contain errors and are neither a credit assessment nor business advice.
Statistics
How the company ranks by revenue within its industry, city, voivodeship and across Poland in 2025.
Results vs industry
Industry
Public procurement
26 tenders recorded as contractor, with a total value of $10,353,373.
| Publication date | Subject | Amount | Contracting authority | |
|---|---|---|---|---|
| Jul 8, 2026 | Construction of roads in Gmina Osielsko in 2026 | $330.6K$330,592 | Gmina Osielsko | |
| Apr 3, 2026 | Construction of streets under the “Program utwardzania ulic gruntowych zlokalizowanych na terenie miasta Bydgoszczy” using the design-and-build system | $328.6K$328,598 | Zarząd Dróg Miejskich i Komunikacji Publicznej w Bydgoszczy | |
| Oct 22, 2025 | Renovation of sidewalks in Powiat Bydgoski | $66,408$66,408 | Powiat Bydgoski |
Przedsiębiorstwo Produkcyjno - Usługowe Affabre is the contractor in 2 public sector contracts, worth USD 415.26k in total. All of them were signed with the same public buyer.
| Signed on | Subject | Amount | Public buyer | |
|---|---|---|---|---|
| Jul 6, 2026 | Construction of a pavement on ul. Narcyzowa in Osielsko, comprising: a 1.8 m wide pavement made of concrete paving blocks; individual driveways made of concrete paving blocks; paths to gates made of concrete paving blocks; 2 raised pedestrian crossings; demolition works; a French drain; construction of lighting with lamps illuminating pedestrian crossings; tree felling and grubbing; horizontal and vertical road markings and BDR elements—safety barriers and bollards; 15 cm topsoiling and grass seeding. | $64,749 | Gmina Osielsko | |
| Jul 6, 2026 | Construction of ul. Koźlakowa in Niemcz, comprising construction of:
- a 4.50 m-wide carriageway with concrete block paving,
- individual driveways with concrete block paving,
- paths to gates with concrete block paving,
- 0.75 m-wide shoulders reinforced with aggregate,
- protection of the telecommunications network with A120 PS-type two-piece protective conduits,
- protection of the power network with blue PE ϕ110 protective conduits on the low-voltage network,
- demolition works,
- adjustment of valve chambers and manholes,
- stormwater drainage using class S SDR-34 (SN8) PCV-U pipes, with concrete inspection chambers of 1000, 1200 mm diameter, together with stormwater inlets with 0.5 m-deep sediment traps and 200 mm φ service connections made of class S SDR-34 (SN8) PCV-U pipes,
- construction of a telecommunications technical duct comprising cable ducts made of DVK110, RHDPE Ø125/7.1 and RHDPE Ø110/6.3 pipes, cable conduits made of HDPE Ø40/3.7 pipes, microduct conduits (a prefabricated bundle of microducts (7x12/8 mm)), and SKR-1 telecommunications chambers,
- street lighting – 7 luminaires numbered 1/1/1, 1/1/2, 1/1/4, 1/1/1/2, 1/1/5, 1/1/6, 1/1/8 and a YAKY 4x25mm2 cable line,
- tree felling and grubbing,
- horizontal and vertical road markings,
- 10 cm topsoil spreading and grass seeding. | $350,515 | Gmina Osielsko |
Trademarks
Przedsiębiorstwo Produkcyjno - Usługowe Affabre holds 1 active trademark registered with the Polish Patent Office. The first mark was filed in 1997.
| Mark | Protected until | |
|---|---|---|
| AFFABRE | Apr 15, 2027 |
Authorized Representatives
Manner of representation
Independent representation – each member of the management board, to make declarations concerning property rights and obligations.
Ownership
| Owner | Shares | Share value | Stake |
|---|---|---|---|
Marek Maciej Dembowyage 63 | 50 | $6,753.11 | 50% |
Dariusz Grzegorz Płacińskiage 64 | 50 | $6,753.11 | 50% |
Beneficial owners
| Person | Rights |
|---|---|
Bank accounts
Registered as a VAT taxpayer on 1993-07-05.
31 1090 1072 0000 0001 3000 7498
58 1090 1072 0000 0001 1626 4925
90 1090 1072 0000 0001 1626 4737
Debt
No entries in the National Debtors Register (KRZ).
Public aid
7 public aid cases recorded, with a total value of $301,764.
| Grant date | Purpose | Gross amount | Granting body | |
|---|---|---|---|---|
| Oct 7, 2020 | Aid compensating for the negative economic consequences of COVID-19, granted in limited amounts | $10,091$10,091 | Prezes Zakładu Ubezpieczeń Społecznych | |
| Jun 9, 2020 | Aid compensating for the negative economic consequences of COVID-19, granted in limited amounts | $268.2K$268,207 | Polski Fundusz Rozwoju S.A. | |
| Apr 17, 2020 | De minimis aid (in accordance with Commission Regulation No 1407/2013 or earlier) | $7,294$7,294 | Prezes Banku Gospodarstwa Krajowego |
Regulatory authorisations
| Authority | Type | Status | |
|---|---|---|---|
| BDO register entry | Active |
Competitors
| Name | Revenue | Website | ||
|---|---|---|---|---|
| Firma Inżynieryjno-Drogowa Drogtomsp. z o.o. | $21,340,845.46 | drogtom.pl | ||
| BetpolS.A. | $9,058,714.86 | betpol.pl | ||
| Solo Duosp. z o.o. | $4,609,102.39 | soloduo.pl | ||
| Bruklin Infrastrukturasp. z o.o. | $2,946,560.46 | bruklin.pro | ||
| Reznaksp. z o.o. | $2,794,906.44 | reznak.pl | ||
| Binnar Polskasp. z o.o. | $2,754,212.79 | binnar.com.pl | ||
| Pavimentsp. z o.o. | $154,364.10 | paviment.pl | ||
| Przedsiębiorstwo Budowlano - Usługowe BudopolS.A. | $353.80 | budopol.com.pl | ||
| Drogi Powiatowesp. z o.o. | $2.94 | wabrzezno.pl | ||
| KobylarniaS.A. | – | kobylarnia.pl |
Change history
| Date | Event | |
|---|---|---|
| 2019-11-13 | PKD change (Removed: 65 codes) | |
| 2010-01-08 | Switch to PKD 2007 (80 PKD 1997 codes → 75 PKD 2007 codes) | |
| 2006-01-19 | Share capital increase (25,000.00 PLN → 50,000.00 PLN) | |
| 2004-02-10 | Entered in the register |
FAQ
Last updated: 2026-06-25