Overview
Financials
Revenue history (in k)
From the notes
| Current income tax (CIT due) | $6,991 |
Filing timeliness
4 of 6 financial statements were filed late (the longest delay 97 days for 2021).
- 202516/07/2026
- 202414/07/2025
- 202320/07/2024
- 202217/07/2023
- 202120/10/2022
- 202011/10/2021
Data and insights are generated automatically from financial statements – they may contain errors and are neither a credit assessment nor business advice.
Statistics
How the company ranks by revenue within its industry, city, voivodeship and across Poland in 2025.
Results vs industry
Industry
Public procurement
22 tenders recorded as contractor, with a total value of $4,277,637.
| Publication date | Subject | Amount | Contracting authority | |
|---|---|---|---|---|
| Sep 28, 2026 | Routine maintenance of vertical and horizontal road signs in Gmina Konstancin-Jeziorna in 2026 – stage II | –– | Gmina Konstancin-Jeziorna | |
| Sep 28, 2026 | Works involving horizontal and vertical road marking and traffic safety devices on municipal and internal roads administered by Urząd Dzielnicy Mokotów | –– | Miasto Stołeczne Warszawa Dzielnica Mokotów | |
| Sep 15, 2026 | Purchase and installation of traffic safety elements and elements protecting road users along provincial roads – “Change of permanent traffic organisation” – second procedure | –– | Podkarpacki Zarząd Dróg Wojewódzkich |
Fenix Sr is the contractor in 12 public sector contracts, worth USD 772.09k in total. They were signed with 8 public buyers. The largest number (4) were signed with Urząd Miasta Stołecznego Warszawy.
| Signed on | Subject | Amount | Public buyer | |
|---|---|---|---|---|
| Oct 20, 2026 | 1. The Contractor undertakes to dismantle the existing handrails and manufacture, deliver and install 4 outdoor stair handrails at ul. Włoska in Tarnowskie Góry, totalling 10 linear metres, in accordance with the description of the subject of the contract constituting Annex No. 1 to this Agreement and the Contractor's tender constituting Annex No. 2 to the Agreement. 2. The scope includes all measurements and preparatory work; manufacture of steel handrails from Ø 42 mm tubes, 1.1 m high, with two coats of anticorrosive primer and one top coat, RAL 7005; construction of suitable concrete foundations; transport; securing the site; dismantling and disposal of waste; and site cleanup. 3. From the commencement of the works, the Contractor shall ensure effective fencing and marking of the work area and protect pedestrians, taking into account the immediate proximity of a public road and parking spaces within the road area. In particular, the Contractor shall prevent the use of hazardous sections of the stairs or provide a safe alternative route, in agreement with the Contracting Authority. The Contractor shall not leave unsecured stairs or uncovered excavations, including outside working hours. | $1,405 | Miejski Zarząd Ulic I Mostów | |
| Sep 30, 2026 | 1.1 The subject of the contract includes the installation, removal, positioning and repositioning of road signs, posts and street-name plates, the installation and maintenance of road barriers, and the implementation of traffic organization changes, including:
a) Positioning new road-sign posts made of galvanized steel pipes with a minimum diameter of 60 mm, with anchor and cap, average length 3.5 m,
b) Installation and removal of a salvaged post (including repositioning the post) made of a steel pipe with a minimum diameter of 60 mm,
c) Attaching new road-sign plates in categories A, B, C, D, E, F, G, U, T and other plates with an area up to 0.3 m2, including “mini” signs,
d) Attaching new road-sign plates in categories A, B, C, D, E, F, G, U, T and other plates with an area above 0.3 m2,
e) Attaching new road-sign plates A-7, B-2, B-20, D-6, D-6a, D-6b with an area above 0.3 m2, made of second-generation reflective sheeting,
f) Removing road-sign plates and other plates, including street-name plates, and installing a salvaged sign face (repositioning and refastening plates),
g) Installing 1 new element of a modular speed bump (straight or end element),
h) Removing 1 speed-bump element (all types) and installing a salvaged speed-bump element,
i) Installing a new U-18a road mirror with a diameter of 900 mm or U-18b mirror measuring 1000 x 800 mm,
j) Installing new road-sign posts made of steel pipes with a diameter of 50 mm – equivalent to installing a U-5b obstacle delineator post with a C-9 sign with a diameter of 4 | $5,443 | Miejski Zarząd Ulic I Mostów | |
| Sep 25, 2026 | Ongoing maintenance of vertical and horizontal road markings in Gmina Konstancin - Jeziorna in 2026 | $27,264 | Urząd Miasta i Gminy Konstancin-Jeziorna |
Fenix Sr has been a party to 2 cases before the National Appeal Chamber (since 2016). In 1 case it joined the proceedings as a participant.
| Date | Subject of dispute | Outcome | Other party | |
|---|---|---|---|---|
| Jun 3, 2025 | Abnormally low price | Upheld | Gmina Łomianki | |
| Jun 29, 2016 | Abnormally low price | Upheld | Gmina Częstochowa – Miejski Zarząd Dróg i Transportu w Częstochowie |
Authorized Representatives
Manner of representation
If the management board is a one-person management board, the company is represented by the President of the Management Board; if the management board is a multi-member management board, joint action by two members of the management board or by one member of the management board jointly with a commercial proxy is required to make declarations on behalf of the company.
Ownership
| Owner | Shares | Share value | Stake |
|---|---|---|---|
Dawid Kazimierz Kołodyńskiage 46 | 1,202 | $32,468.94 | 99.9169% |
Others | 1 | $27.01 | 0.0831% |
Beneficial owners
| Person | Rights |
|---|---|
Bank accounts
Registered as a VAT taxpayer on 2014-10-22.
18 1750 0012 0000 0000 3311 2475
40 1020 4900 0000 8902 3485 3080
Debt
No entries in the National Debtors Register (KRZ).
Public aid
8 public aid cases recorded, with a total value of $79,670.
| Grant date | Purpose | Gross amount | Granting body | |
|---|---|---|---|---|
| Jan 30, 2025 | De minimis aid (in accordance with Commission Regulation 2023/2831) | $4,520$4,520 | Prezes Banku Gospodarstwa Krajowego | |
| Jul 12, 2024 | De minimis aid (in accordance with Commission Regulation 2023/2831) | $10,023$10,023 | Prezes Banku Gospodarstwa Krajowego | |
| Jan 30, 2024 | De minimis aid (in accordance with Commission Regulation No 1407/2013 or earlier) | $2,506$2,506 | Prezes Banku Gospodarstwa Krajowego |
Regulatory authorisations
| Authority | Type | Status | |
|---|---|---|---|
| BDO register entry | Active |
Competitors
| Name | Revenue | Website | ||
|---|---|---|---|---|
| MDI EnergiaS.A. | $64,321,195.38 | mdienergia.pl | ||
| G & Msp. z o.o. | $26,055,703.81 | gm.biz.pl | ||
| EkopresS.A. | $13,782,692.05 | ekopres.pl | ||
| MS Bud sp. z o.o.sp. k. | $8,103,717.46 | msbud.waw.pl | ||
| Impresa Pizzarotti & C. S.P.A.Branch (foreign co.) | $4,690,266.13 | pizzarotti.it | ||
| Bruklin Infrastrukturasp. z o.o. | $2,946,560.46 | bruklin.pro | ||
| Sawalcosp. z o.o. | $1,273,091.56 | sawalco.pl | ||
| PlanetaS.A. | $373,846.26 | planeta.com.pl | ||
| Hebruksp. z o.o. | $129,590.75 | hebruk.pl | ||
| Pizzarotti SaBranch (foreign co.) | $17,600.57 | pizzarotti.ch |
Change history
| Date | Event | |
|---|---|---|
| 2026-06-03 | Address change (Ul. Władysława Broniewskiego 22a/33, 01-771, Warszawa → Aleja Jana Pawła Ii 12, 00-124, Warszawa) | |
| 2026-06-03 | PKD change (Removed: 43.21.Z, 43.31.Z, 43.33.Z, 43.34.Z, 43.39.Z) | |
| 2015-12-23 | Address change (Racjonalizacji 5, 02-673, Warszawa → Ul. Władysława Broniewskiego 22a/33, 01-771, Warszawa) | |
| 2015-12-23 | Name change (Data Rnd → Fenix Sr) | |
| 2015-12-23 | PKD change (Removed: 56 codes; Added: 10 codes) |
FAQ
Last updated: 2026-07-16