Runarsson Engineeringsp. z o.o.

Engineering activities and related technical consultancy

KRS: NIP: REGON:

Overview

Status
Active
Registry date
2018-09-26
Share capital
10,000.00 PLN
Activity description

Runarsson Engineering designs and manufactures components for biomass combustion, waste-to-energy and pyrolysis plants, as well as steel structures and filtration equipment. The company delivers subsystems and complete turnkey projects, and provides installation, rebuilding, renovation and maintenance services.

Registered address
ul. Aleja Jana Pawła II 63B, 27-400 Ostrowiec Świętokrzyski, Poland
Phone
Electronic delivery address
AE:PL-91475-29443-DBHSF-22

Financials

Revenue history (in k)

Filing timeliness

3 of 6 financial statements were filed late (the longest delay 377 days for 2021). 1 of 6 audited by a statutory auditor.

  • 202519/12/2025
  • 202419/12/2024
  • 202305/10/2023
  • 202227/01/2023
  • 202127/01/2023
  • 201918/05/2020
Filed on timeDelayFiling deadline

Data and insights are generated automatically from financial statements – they may contain errors and are neither a credit assessment nor business advice.

Statistics

How the company ranks by revenue within its industry, region and across Poland in 2025.

Results vs industry

Revenue
This companyUSD 397.19kMedianUSD 167.86kAverageUSD 1.12m
Net profit
This companyUSD 7.05kMedianUSD 8.43kAverageUSD 67.64k
Operating costs
This companyUSD 381.42kMedianUSD 143.75kAverageUSD 1.05m
Assets
This companyUSD 99.05kMedianUSD 125.99kAverageUSD 861.89k

News

60 Tons of Galvanized Steel – Design, Calculations, Manufacturing & Installation by Runarsson a/s

60 Tons of Galvanized Steel – Design, Calculations, Manufacturing & Installation by Runarsson a/s

Runarsson delivered the complete steel support structure for the heat pumps at Halsnæs Forsyning A/S's new climate-focused plant. The structure is designed to carry the full operational load of the heat pump installation. The project consists of a total of 28 frames for evaporators, elevated to a height of 6 metres, with a service tunnel running between the frames. In total, the structure comprises 60 tonnes of galvanized steel, and our scope of supply included design, structural calculations…

From a 400kW Test Plant to a 20MW Commercial Plant by Runarsson

From a 400kW Test Plant to a 20MW Commercial Plant by Runarsson

Stiesdal SkyClean Pyrolysis Technology The core of SkyClean is a pyrolysis process in which organic waste from agriculture and forestry is converted into biochar, gas, and oil by heating it to a high temperature in the absence of oxygen. Runarsson and Stiesdal have worked together on the engineering, design, manufacturing, and installation of Stiesdal's pyrolysis plants. Our cooperation began with the manufacture of stainless steel heat exchangers for the 400 kW pilot plant and expanded…

Hinnerup District Heating – 12MW Straw-Fired Boiler Plant by Runarsson

Hinnerup District Heating – 12MW Straw-Fired Boiler Plant by Runarsson

The summer of 2017, Runarsson A/S was contacted by the main contractor for Hinnerup District Heating 12Mw straw-fired boiler plant. Their primary subcontractor had gone bankrupt. So the project was at a standstill. Many parts had been delivered, but there was a lot missing and montering was not near completion. Runarsson A/S become the main partner to finalize the plant. This was the start of a long-term collaboration with Hinnerup District Heating. That is still ongoing.

Ringsted District Heating Plant 14MW Straw-Fired Plant by Runarsson

Ringsted District Heating Plant 14MW Straw-Fired Plant by Runarsson

Runarsson A/S delivered a 12+2MW plant for Ringsted Forsyning’s heating plant in Benløse. The plant is engineered with 20% overcapacity, enabling a total output exceeding 14MW. As with previous projects, Runarsson A/S was responsible for the core components, including the complete feeding system with bale shredder, grate and boiler, flue gas cleaning system, ash handling system, and all supporting structures such as access routes and galleries. The plant was delivered on time and within budget…

Complete Design and Installation in Rødby by Runarsson

Complete Design and Installation in Rødby by Runarsson

10Mw Straw-Fired District Heating Plant: In 2020/21, Runarsson A/S constructed a straw-fired district heating plant with a capacity of up to 10Mw for Rødby Fjernvarme. 8MW + 20% overcapacity, providing a total output of 10Mw at 110°C at 6 bar pressure. Runarsson A/S designed the majority of the facility and was responsible for the manufacturing and installation of the core components. The delivery included a boiler with a shell-and-tube heat exchanger positioned above a pusher grate, a bag…

Project – Pipe Bridge in Odense by Runarsson

Project – Pipe Bridge in Odense by Runarsson

Odense is the 3rd biggest city in Denmark, and there, once again, we had to realize an interesting pipe bridge project, for a big heat-pump installation.

Offer

  • Biomass and waste processing plants
  • Steel structures
  • Industrial machinery
  • Ash conveyors
  • Fuel feeders
  • Bag filters
  • Engineering design

Website technology

Website
  • WordPress
  • Elementor
Analytics and marketing
  • Google Analytics

Authorized Representatives

Damian Jakub Stola – President of the Management Board
Hermann Runarsson – Vice President of the Management Board

Manner of representation

The President of the Management Board is authorised to make declarations of will on behalf of the company independently, and each member of the management board other than the President of the Management Board is authorised to do so jointly with the President of the Management Board.

Ownership

OwnerSharesShare valueStake
Runarsson A/s
60$1,620.7560%
Damian Jakub Stolaage 41
40$1,080.5040%

Beneficial owners

Person

Bank accounts

Registered as a VAT taxpayer on 2018-11-01.

Debt

No entries in the National Debtors Register (KRZ).

Public aid

6 public aid cases recorded, with a total value of $13,687.

PurposeGross amount
De minimis aid (in accordance with Commission Regulation No 1407/2013 or earlier)
$3,178
De minimis aid (in accordance with Commission Regulation No 1407/2013 or earlier)
$2,007
Aid compensating for the negative economic consequences of COVID-19, granted in limited amounts
$2,779

Competitors

Name
Bio-Processp. z o.o.
Ekotop Roman Sobczyksp. k.
Arcanus Projektsp. z o.o.
Eurotec Recycling Systemssp. z o.o.
Arucon Polskasp. z o.o.
Etgarsp. z o.o.
Synerga-Bpsp. z o.o.
CH2sp. z o.o.
Proryssp. z o.o.
WAKO Energysp. z o.o.

Change history

DateEvent
2024-06-10Address change
2018-09-26Entered in the register

FAQ

Last updated: 2026-04-08