
Overview
Hydrobim specializes in hydrotechnical design for infrastructure projects, particularly railways and roads, and develops digital hydrological and hydraulic models. Its services include drainage systems, water-law documentation, BIM-based design, river renaturation, flood protection, hydrological analysis and project supervision, alongside risk management using BIM and GIS.
Financials
Revenue history (in k)
Filing timeliness
2 of 6 financial statements were filed late (the longest delay 35 days for 2021).
- 202526/06/2026
- 202407/07/2025
- 202316/07/2024
- 202201/07/2023
- 202119/08/2022
- 202022/06/2021
Data and insights are generated automatically from financial statements – they may contain errors and are neither a credit assessment nor business advice.
Statistics
How the company ranks by revenue within its industry, city, voivodeship and across Poland in 2025.
Results vs industry
Industry
Offer
- Hydrotechnical structure design
- Water permit documentation
- Hydrological modelling
- Drainage systems
- Retention tanks
- Flood protection
- River renaturalization
Websites
The site is available in: Polish and English.
- hydrobim.plHydrotechnika dla infrastruktury liniowej - HydroBIMWordPress 7.1ElementorGoogle AnalyticsGoogle Tag ManagerRRank MathApache
Public procurement
3 tenders recorded as contractor, with a total value of $234,251.
| Publication date | Subject | Amount | Contracting authority | |
|---|---|---|---|---|
| Jul 17, 2026 | Preparation of design documentation for the project “Modernisation of the right embankment of the Wisłoka river at km 45+500-46+600 together with the backwater embankment (left embankment of the Brzeźnica river at km 0+000-0+883) and construction...” | $134.6K$134,562 | Państwowe Gospodarstwo Wodne Wody Polskie | |
| Oct 9, 2025 | Preparation of a functional and utility programme for the project “Stormwater management in the Paryja stream catchment area” | $60,234$60,234 | Gmina Miasto Rzeszów - Urząd Miasta Rzeszowa | |
| Sep 15, 2022 | Preparation of complete design documentation, including obtaining the necessary administrative decisions, for the project: “Construction of a backwater embankment on the Gogołówka stream over a length of 1300 m” | $39,455$39,455 | Państwowe Gospodarstwo Wodne Wody Polskie |
The company is the contractor in 6 public sector contracts, worth USD 709.05k in total. They were signed with 3 public buyers. The largest number (4) were signed with Państwowe Gospodarstwo Wodne Wody Polskie.
| Signed on | Subject | Amount | Public buyer | |
|---|---|---|---|---|
| Oct 22, 2026 | The order concerns the preparation of a Programme of natural and/or hydromorphological monitoring for the project "Kompleksowa przebudowa systemu gospodarowania wodami odpadowymi w zlewni Jeziora Nowogardzkiego z wykorzystaniem rozwiązań opartych na przyrodzie, Nowogard- ul. Zielona oraz 3 Maja". | $1,351 | Gmina Nowogard | |
| Oct 20, 2026 | Preparation of technical documentation for the investment project “Odwodnienie terenów inwestycyjnych w Koninie” | $265,802 | Konin-Miasto na Prawach Powiatu | |
| Aug 6, 2026 | The subject of the agreement is the preparation by the contractor for the contracting authority of a design solutions concept for the project “Flood protection for Gmina Pawłowice”. As part of the concept, a preliminary analysis will be conducted of options for protecting Gmina Pawłowice against flooding through passive and active flood protection measures. | $97,245 | Państwowe Gospodarstwo Wodne Wody Polskie |
Trademarks
The company currently holds no active trademarks with the Polish Patent Office. 1 mark has expired or was not registered. The first mark was filed in 2025.
| Mark | Protected until | |
|---|---|---|
| HydroBIM (word) | – |
Job offers
The company has its own careers page: hydrobim.pl/kontakt.
Authorized Representatives
Manner of representation
Each member of the management board is authorized to make declarations on behalf of the company independently.
Ownership
| Owner | Shares | Share value | Stake |
|---|---|---|---|
Tuiarek Fundacja Rodzinna w Organizacji | 100 | $1,350.62 | 100% |
Beneficial owners
| Person | Rights |
|---|---|
Bank accounts
Registered as a VAT taxpayer on 2019-08-01.
84 1090 2590 0000 0001 6592 1447
73 1090 2590 0000 0001 6592 1548
39 1140 2004 0000 3002 7896 7393
Debt
No entries in the National Debtors Register (KRZ).
Public aid
5 public aid cases recorded, with a total value of $14,710.
| Grant date | Purpose | Gross amount | Granting body | |
|---|---|---|---|---|
| May 15, 2026 | De minimis aid (in accordance with Commission Regulation 2023/2831) | $1,124$1,124 | Prezes Banku Gospodarstwa Krajowego | |
| Jun 28, 2023 | De minimis aid (in accordance with Commission Regulation No 1407/2013 or earlier) | $4,315$4,315 | Marszałek Województwa Małopolskiego | |
| Mar 18, 2022 | De minimis aid (in accordance with Commission Regulation No 1407/2013 or earlier) | $4,589$4,589 | Małopolska Agencja Rozwoju Regionalnego S.A. |
Competitors
| Name | Revenue | Website | ||
|---|---|---|---|---|
| Norconsult Polska sp. z o.o. | $2,883,614.97 | norconsult.pl | ||
| Mosty Kraków S.A. | $1,977,532.48 | mpmosty.pl | ||
| Quick Bim sp. z o.o. | $1,965,088.05 | quick-bim.eu | ||
| Progea 4d sp. z o.o. | $1,486,711.85 | progea4d.pl | ||
| Biprokom-Kraków S.A. | $1,113,048.16 | biprokom.com.pl | ||
| Infra Plan sp. z o.o. | $817,393.85 | infra-plan.pl | ||
| WTU sp. z o.o. | $507,429.79 | wtu.com.pl | ||
| MC2 Projekty sp. z o.o. | $448,417.36 | mc2projekty.pl | ||
| Etgar sp. z o.o. | $362,047.17 | etgar.pl | ||
| AP Infrastruktura sp. z o.o. | $281,251.42 | apinfrastruktura.pl |
Change history
| Date | Event | |
|---|---|---|
| 2025-11-19 | Switch to PKD 2025 (7 PKD 2007 codes → 7 PKD 2025 codes) | |
| 2024-01-09 | Address change (Ul. Franciszka Kniaźnina 4/U13, 31-637, Kraków → Ul. Olszańska 7, 31-513, Kraków) | |
| 2021-04-28 | Name change (Infrabim Tomasz Rajpold → Hydrobim) | |
| 2019-07-04 | Entered in the register |
FAQ
Last updated: 2026-06-30
