
Overview
Elektrolex is an electrical and energy company based in Racibórz, specializing in the design and construction of power networks and providing horizontal directional drilling services. They operate primarily in the Silesian and Opole Voivodeships, offering a range of services including project planning, execution, and supervision of electrical installations. With over 20 years of experience, they focus on advanced electrical engineering projects and controlled drilling techniques.
Financials
Revenue history (in k)
Financial insight
- Estonian CIT: Equity includes non-zero Art. 28d line items – the company is taxed under the lump-sum regime on corporate income.
Filing timeliness
Financial statements were filed on time, on average 88 days early.
- 202502/07/2026
- 202411/07/2025
- 202307/02/2024
- 202227/03/2023
- 202115/03/2022
- 202017/06/2021
Data and insights are generated automatically from financial statements – they may contain errors and are neither a credit assessment nor business advice.
Statistics
In 2025, Elektrolex was among the top 6% of companies by revenue in the electrical installation industry and ranked 37th in Racibórz.
Results vs industry
Industry
Offer
- Power grid design
- Power grid construction
- Horizontal directional drilling
- Rock drilling
- Street lighting installation
- Cable networks
- Transformer substations
Websites
- elektrolex.plPrzedsiębiorstwo elektroenergetyczne | ElektrolexDrupal 10Google AnalyticsGoogle Tag ManagerCloudflareApache
Public procurement
3 tenders recorded as contractor: 2 national ($469,314) and 1 EU ($104,387).
| Publication date | Subject | Amount | Contracting authority | |
|---|---|---|---|---|
| Jul 21, 2025 | Replacement of the 20kV power cable from GPZ Brzezinka bay No. 29 to Stacja Transformat. 20kV bay No. 8, on the section from ul. K. Miarki to ul. Leśna, for Spółka Restrukturyzacji Kopalń s.a. O/Czok PS „Mysło” | $384.2K$384,229 | Spółka Restrukturyzacji Kopalń S.A. | |
| Feb 28, 2024 | Execution of works related to connecting group III consumers within the area of operation of tauron Dystrybucja s.a. Oddział w Gliwicach | $104.4K$104,387 | Tauron Dystrybucja S.A. | |
| Jul 20, 2022 | Preparation of technical documentation and construction of an electricity connection in Tworków – securing the energy needs of the swimming pool infrastructure | $85,085$85,085 | Gmina Krzyżanowice |
The company is the contractor in 2 public sector contracts, worth USD 7.61k in total. All of them were signed with the same public buyer.
| Signed on | Subject | Amount | Public buyer | |
|---|---|---|---|---|
| Sep 28, 2026 | Performing the duties of electrical supervision inspector for the project: "Montaż paneli fotowoltaicznych na obiektach oświatowych i użyteczności publicznej Gminy Krzyżanowice" | $6,896 | Gmina Krzyżanowice | |
| Aug 4, 2026 | Installation of a grounding connection for the container at the wastewater treatment plant in Krzyżanowice, ul. Wyzwolenia – municipal land | $715.83 | Gmina Krzyżanowice |
Authorized Representatives
Manner of representation
Each member of the management board is authorized to make declarations on behalf of the company independently.
Ownership
| Owner | Shares | Share value | Stake |
|---|---|---|---|
Dawid Mariusz Leks age 28 | 100 | $2,701.24 | 20% |
Edyta Maria Leks age 57 | 100 | $2,701.24 | 20% |
Łukasz Stefan Leks age 35 | 100 | $2,701.24 | 20% |
Mateusz Józef Leks age 36 | 100 | $2,701.24 | 20% |
Rajmund Henryk Leks age 60 | 100 | $2,701.24 | 20% |
5 shareholders named Leks hold a combined 100% – the ownership structure indicates family control.
Beneficial owners
| Person | Rights |
|---|---|
Sanctions and PEP
Sanctions
No matches (EU, UN, US, UK, MSWiA, World Bank)
PEP
No matches
Bank accounts
Registered as a VAT taxpayer on 2020-12-01.
26 1050 1344 1000 0090 8109 2877
Debt
No entries in the National Debtors Register (KRZ).
Public aid
| Grant date | Purpose | Gross amount | Granting body | |
|---|---|---|---|---|
| Jan 13, 2025 | De minimis aid (in accordance with Commission Regulation 2023/2831) | $21,151$21,151 | Prezes Banku Gospodarstwa Krajowego | |
| Jan 13, 2025 | De minimis aid (in accordance with Commission Regulation 2023/2831) | $5,023$5,023 | Prezes Banku Gospodarstwa Krajowego |
Regulatory authorisations
| Authority | Type | Status | |
|---|---|---|---|
| BDO register entry | Active |
Competitors
| Name | Revenue | Website | ||
|---|---|---|---|---|
| ZEG sp. z o.o. | USD 9.11m | zeggryfice.pl | ||
| PRE Elkom sp. z o.o. | USD 6.75m | elkom-olesno.pl | ||
| Wieleba sp. z o.o. | USD 6.71m | wieleba.pl | ||
| AMEL sp. z o.o. | USD 6.39m | amelsystemy.pl | ||
| Creotec sp. z o.o. | USD 5.77m | creotec.com.pl | ||
| Hydroinstalmet sp. z o.o. | USD 5.62m | hydroinstalmet.pl | ||
| Marad Energia sp. z o.o. | USD 5.22m | marad.sosnowiec.pl | ||
| Eltech Łódź K.M. Dąbrówka sp. z o.o. | USD 4.55m | eltechlodz.com | ||
| G.R. Eximus sp. z o.o. | USD 4.06m | greximus.pl | ||
| Przedsiębiorstwo Budownictwa Elektroenergetycznego Elbud w Katowicach sp. z o.o. | USD 1.47m | elbud.katowice.pl |
Market environment
Conditions in the utility construction industry are mixed: demand is growing (+7.3% y/y) and company revenue is growing (+10.2% in 2025), but bankruptcies in construction are rising (+37.5% over 12 months).
In 2025, revenue of a typical company in the utility construction industry rose 10.2% (a year earlier +7.3%, 5-year median +14.3% a year).
Source: KRS financial statements, n = 400
Output in the civil engineering industry rose 7.3% year on year, more than four times as fast as the 5-year median (+1.7% a year).
Source: Monitly (Eurostat)
Bankruptcies in construction rose 37.5% over 12 months year on year, against a 5-year median of −3.8% a year.
Source: Monitly (Eurostat)
Change history
| Date | Event | |
|---|---|---|
| 2024-08-02 | Address change (Ul. Ks. Józefa Londzina 15, 47-400, Racibórz → Ul. Bartka Lasoty 11, 47-400, Racibórz) | |
| 2020-12-01 | Name change (Elextrolex → Elektrolex) | |
| 2020-10-29 | Entered in the register |
FAQ
Last updated: 2026-07-02