
Kwidzyńskie Przedsiębiorstwo Robót Drogowo-Budowlanych Strzelbudsp. z o.o.
Construction of roads and motorways
Overview
Financials
Revenue history (in m)
Filing timeliness
5 of 6 financial statements were filed late (the longest delay 158 days for 2021). 1 of 6 audited by a statutory auditor.
- 202504/08/2026
- 202411/07/2025
- 202306/08/2024
- 202220/09/2023
- 202120/12/2022
- 202020/10/2021
Data and insights are generated automatically from financial statements – they may contain errors and are neither a credit assessment nor business advice.
Statistics
How the company ranks by revenue within its industry, region and across Poland in 2025.
Results vs industry
Industry
Public procurement
153 tenders recorded as contractor: 144 national ($114,721,741) and 9 EU ($5,935,500).
| Publication date | Subject | Amount | Contracting authority | |
|---|---|---|---|---|
| Oct 29, 2026 | Patching bituminous road surfaces with asphalt concrete within the area of Rejon Dróg Wojewódzkich w Sztumie | –– | Zarząd Dróg Wojewódzkich w Gdańsku | |
| Oct 23, 2026 | Reconstruction of municipal road no. 180095N Szwarcenowo-Trupel | –– | Gmina Biskupiec | |
| Oct 8, 2026 | “Spot repairs to bituminous surfaces of regional roads and streets administered by Rejon Dróg Wojewódzkich w Nidzicy, Obwód Drogowy w Iławie – Lot 4” | –– | Zarząd Dróg Wojewódzkich w Olsztynie |
Kwidzyńskie Przedsiębiorstwo Robót Drogowo-Budowlanych Strzelbud is the contractor in 26 public sector contracts, worth USD 4.95m in total. They were signed with 11 public buyers. The largest number (3) were signed with Starostwo Powiatowe w Kwidzynie.
| Signed on | Subject | Amount | Public buyer | |
|---|---|---|---|---|
| Oct 28, 2026 | Construction works: “Reconstruction of the road surface in Kisielice, ul. Zagrodowa – stage 2”.
The contract subject includes, in particular: preparatory, surveying and earthworks; main works – drainage, excavations, installation of sanitary equipment; road widening – main works, subbase layers; carriageway – main works, subbase layers and surfaces; access roads – main works, drainage layers, subbase layers and surfaces; road shoulder – surfaces; ancillary and finishing works; preparation and approval of temporary traffic organisation (for the duration of the works); as-built documentation in paper form; implementation of permanent traffic organisation (purchase and installation of signage).
The detailed contract subject is specified in the contract and tender procedure documentation. | $235,441 | Gmina Kisielice | |
| Oct 28, 2026 | Construction works: “Reconstruction of municipal road 144015N in Goryń”.
The contract covers, in particular: preparatory works; surface works – carriageway along the existing road alignment; surface works – carriageway on widened sections and access roads; road shoulders; earthworks; preparation and approval of temporary traffic management (for the duration of the works); as-built documentation in paper form (PDF format); implementation of permanent traffic management (purchase and installation of signage).
The detailed description of the contract subject was specified in the contract and documents under procedure No. RRG.271.2.13.2026 conducted under the basic procedure (Article 275(2) of the Public Procurement Law) | $236,621 | Gmina Kisielice | |
| Oct 19, 2026 | Basalt grit | $1,422 | Zarząd Dróg Powiatowych w Pasłęku |
Kwidzyńskie Przedsiębiorstwo Robót Drogowo-Budowlanych Strzelbud has been a party to 1 case before the National Appeal Chamber (since 2026). In 1 case it joined the proceedings as a participant.
| Date | Subject of dispute | Outcome | Other party | |
|---|---|---|---|---|
| Jun 10, 2026 | Abnormally low price | Upheld | Gmina Susz |
Job offers
Kwidzyńskie Przedsiębiorstwo Robót Drogowo-Budowlanych Strzelbud currently has 1 active job offer at a public employment office. 1 offer was posted in the last 12 months.
| Position | Gross salary | Added | |
|---|---|---|---|
| Laboratory Technician | from 4,806 PLN/month | 26 Oct 2026 |
Authorized Representatives
Manner of representation
If the company has a multi-member management board, joint action of two members of the management board together is required to make declarations of will on behalf of the company.
Ownership
| Owner | Shares | Share value | Stake |
|---|---|---|---|
Krzysztof Strzelczykage 54 | 26,040 | $7,034,035.66 | 100% |
Beneficial owners
| Person | Rights |
|---|---|
Bank accounts
Registered as a VAT taxpayer on 2003-03-01.
Debt
No entries in the National Debtors Register (KRZ).
Real estate
| Type | Amount |
|---|---|
Land (incl. perpetual usufruct) | $779.7K$779,678 |
Buildings and premises | $14,930$14,930 |
MSiG notices
| Publication date | Event | |
|---|---|---|
| Oct 26, 2021 | Dissolution without liquidation opened |
Public aid
16 public aid cases recorded, with a total value of $1,582,618.
| Grant date | Purpose | Gross amount | Granting body | |
|---|---|---|---|---|
| Feb 19, 2025 | De minimis aid (in accordance with Commission Regulation 2023/2831) | $49,110$49,110 | Prezes Banku Gospodarstwa Krajowego | |
| Aug 8, 2024 | De minimis aid (in accordance with Commission Regulation 2023/2831) | $1,143$1,143 | Starosta Powiatu Kwidzyn | |
| Aug 8, 2024 | De minimis aid (in accordance with Commission Regulation 2023/2831) | $1,062$1,062 | Starosta Powiatu Kwidzyn |
Regulatory authorisations
| Authority | Type | Status | |
|---|---|---|---|
| Waste treatment | Inactive | ||
| Waste collection | Inactive |
Competitors
| Name | Revenue | Website | ||
|---|---|---|---|---|
| Firma Budowlano - Drogowa MtmS.A. | $56,716,696.47 | mtm-sa.com.pl | ||
| Kruszywosp. z o.o. | $32,830,361.27 | kruszywolinia.pl | ||
| Marbruk M. Kwiatkowskisp. k. | $30,146,800.81 | marbruk.pl | ||
| Saferoad Restraint Systemssp. z o.o. | $30,014,680.62 | saferoad-rs.com | ||
| Makaxsp. z o.o. | $25,084,582.00 | makax.com.pl | ||
| Krężelsp. z o.o. | $24,295,235.87 | krezel.com.pl | ||
| Unitraksp. z o.o. | $16,587,811.81 | unitrak.com.pl | ||
| Wprd Gravelsp. z o.o. | $11,219,427.60 | wprdgravel.pl | ||
| Furgessp. z o.o. | $9,402,740.76 | krezel.com.pl | ||
| Saferoad Services Gdańsksp. z o.o. | $8,484,750.69 | saferoad-services.pl |
Change history
| Date | Event | |
|---|---|---|
| 2024-02-09 | Share capital increase (1,550,229.00 PLN → 26,040,000.00 PLN) | |
| 2024-02-09 | PKD change (Removed: 42.21.Z; Added: 01.13.Z) | |
| 2022-01-17 | PKD change (Removed: 42.12.Z, 42.13.Z, 43.11.Z, 52.42.C, 81.29.Z) | |
| 2013-10-04 | Switch to PKD 2007 (26 PKD 1997 codes → 15 PKD 2007 codes) | |
| 2003-10-07 | Share capital increase (50,000.00 PLN → 1,550,229.00 PLN) |
FAQ
Last updated: 2026-10-07
